There is no dependable drying timeline before the affected materials and conditions have been assessed. A fixed promise can overlook hidden moisture, contamination, access limitations or an active source.
Materials change the timeline
Water in an accessible surface does not behave like moisture trapped beneath flooring or inside a wall assembly. Different layers and finishes affect access to moisture. Material condition also determines whether drying is appropriate or whether another decision is needed. Tell the assessor about any layers, repairs or previous leaks you know about.
Drying needs a controlled plan
Air movement and humidity management can be part of drying when appropriate to the conditions. More equipment or higher heat is not automatically a better plan. Keep equipment unobstructed and ask before moving it, switching it off or changing ventilation. Contaminated areas require assessment before ordinary fans are introduced.
What completion should mean
A dry-looking floor and elapsed days are not enough by themselves. Progress should be evaluated using the findings relevant to the material and project. Ask what has been checked, whether any areas could not be accessed and what conditions must be met before repairs or new flooring begin.
When drying seems to stall
Report new water entry, equipment interruptions or newly noticed dampness. The source may still be active, or the initial footprint may need review. Do not cover the area with paint or new finishes simply to move the project forward.